Jewish Community Center

Project Description

The pools at this swim club and summer camp were in need of a makeover. We replaced the coping and waterline tile, installed a caulk line, replaced 8,000 square feet of concrete decking, repaired the bonding and grounding, installed skimmers and rebuilt the bond beam of the main pool. Now adults and children can enjoy these fully renovated pools for swim lessons, water aerobics and swim meets.

-

Related Projects