Shadow Lake Village

Project Description

This condo community wanted to renovate their pool in three phases planned out over several years. In the first phase we installed new waterline tile and multi-colored brick coping. Phase two consisted of pressure washing the pool’s surface to remove old paint and then applying white plaster. This improved the pool’s look while also addressing structural leaks. In the final phase we upgraded their filter system to ensure optimal water quality.

It was a challenge to break the project down over such a long time, but the customer was pleased with our work and that we were on budget and within the established time frame.

-

Related Projects